# Illustrative schedule examples

These sample files accompany the CritPath AI audience guides. They contain hypothetical inputs, not customer records, industry benchmarks, regulatory requirements, or recommended project timelines.

## Choose a sample

- [IND readiness review plan](biotech-ind-readiness-illustrative.csv)
- [Hardware prototype plan](hardware-prototype-illustrative.csv)
- [Federal research milestone plan](federal-research-milestone-illustrative.csv)

Each file contains five activities, four finish-to-start handoffs, and one decision-gate flag. The final review has a nonzero duration because it represents review work.

## Import and review the inputs

1. In the project list, select **Import CSV / XLSX**.
2. Select a sample file.
3. Review the imported task names, estimates, predecessor relationships, and gate.
4. Replace the sample estimates with your team's documented assumptions.
5. Calculate the critical path and review the resulting finish.
6. Run the schedule risk analysis separately to examine uncertainty.

Use an evaluation project. Importing adds project data. The files contain supported work-breakdown columns and do not contain discrete risk events or resource assignments.

## Understand the assumptions

All three examples use the following assumptions:

- Activities without predecessors start from a common origin.
- Each dependency is finish-to-start, with zero lag.
- Duration estimates are working hours. They are not calendar dates or person-hour totals.
- The examples omit resource contention, holidays, calendar constraints, and discrete risk events.
- Optimistic, most likely, and pessimistic estimates are hypothetical inputs.
- The final activity is the endpoint analyzed in the example.
- A gate records a review point. It does not establish readiness, compliance, or sponsor acceptance.

Real programs need additional work, risk events, and constraints. Review the model with the people responsible for each activity.

## Check the deterministic examples

These calculations use only the most likely duration values and the stated dependencies. They are arithmetic checks of the critical-path network, not Monte Carlo results or confidence dates.

| Sample | Baseline finish | Change to the most likely duration | Revised finish |
|---|---:|---|---:|
| IND readiness | max(80, 96, 48) + 40 + 16 = 152 hours | B1 increases from 80 to 120 hours | 176 hours |
| Hardware prototype | max(160, 80) + 40 + 64 + 16 = 280 hours | H1 increases from 160 to 200 hours | 320 hours |
| Federal research | max(80, 120) + 40 + 24 + 16 = 200 hours | F1 increases from 80 to 104 hours | 200 hours |

The IND example starts with 16 hours of float on B1. Its 40-hour increase moves the finish by 24 hours. The federal example starts with 40 hours of float on F1. Its 24-hour increase leaves 16 hours of float.

For a risk analysis after a change, review all three duration estimates and affected risks. Do not treat these most likely changes as a complete uncertainty model.

## Interpret the output

A simulated percentile describes outcomes under the specified assumptions. It does not measure the probability of scientific success, regulatory acceptance, or funding. Model the intended milestone as the project endpoint when evaluating its finish distribution.

The source guides provide additional context:

- [Biotech program management](https://www.criticalschedule.com/solutions/biotech-program-management)
- [Deep-tech hardware program management](https://www.criticalschedule.com/solutions/deep-tech-hardware-program-management)
- [Federal R&D program management](https://www.criticalschedule.com/solutions/federal-rd-program-management)

Prepared November 24, 2026.